Additions and ADUs, drawn and built by one crew.
Design-build for Pasadena's Craftsman and Spanish Revival homes since 2009.
Book a site visitHow it works
- 01Survey
Measured drawings of what's there
- 02Design
Permit set, priced line by line
- 03Permit
We run the city and historic review
- 04Build
One foreman, start to keys



Signature moment. The house frame draws itself in redline — stud by stud, as a drawing becomes a building.
Questions
Do you do design only?
No — we design what we build, so the drawings carry a real price.
Historic districts?
Most of our work is in Bungalow Heaven and Pasadena Playhouse.
How long is an ADU?
Typically 9–12 months from survey to keys.